The aft escape trunk, hard too see any detail in there but it has piping, gauge boards, the lower hatch and bubble skirt in place. This hatch will have the 3 shore power cables running into it, shore power was how electricity was supplied when the boats reactor was shutdown.
Nice clean paint job, I will add the draft marking decals next and then it will be on to adding the final details to the hull, installing the masts I want showing. I will then add the safety railings and other items on the upper hull that are on a ship in dry dock. The dry dock itself needs to be painted and detailed too, currently it is just painted in gray primer to seal the particle board.
No comments:
Post a Comment