Sunday, December 7, 2014

More PE Work on FFG-36

 A lot of tiny pieces went into the weapons loading gear on the front end of the superstructure. 
 Missile launcher and the forward breakwater stiffener structure installed.
 The sea base has its coat of black paint.
 The 01 main deck PE is glued on.
 Several pictures of the main superstructure after assembly.


No comments:

Post a Comment